Money
The remodel budget worksheet
A printable remodel budget worksheet with blank fields, a contingency line and a quick estimate. Example figures are labelled as examples, not prices.
A remodel budget is not a number. It is a set of decisions about what you will spend before you know what the room will ask for. The worksheet below makes those decisions visible: line items, a subtotal, a contingency percentage and a total you can defend.
It starts blank on purpose. Print it, fill it in by hand, or type into the fields and let the total update as you go.
| Line item | What belongs here | Your number |
|---|---|---|
| Design and approvals | ||
| Design and drawings | Kitchen designer, architect or draftsperson. | |
| Permit and inspection fees | Ask your building department for a fee schedule. | |
| Engineering or survey | Only if a wall, beam or addition needs it. | |
| Construction | ||
| Demolition and haul-away | Dumpster, labor, disposal fees. | |
| Framing and structural work | Beams, headers, new openings. | |
| Plumbing | Moving supply or drain lines costs more than replacing fixtures. | |
| Electrical | Circuits, outlets, lighting, panel work. | |
| HVAC and ventilation | Range hood ducting, bath fan, duct moves. | |
| Insulation and drywall | Patch, hang, tape, texture. | |
| Paint and trim | Walls, ceiling, doors, baseboard. | |
| Flooring | Material plus install and transitions. | |
| Tile and waterproofing | Backsplash, shower, floor tile, membrane. | |
| Cabinets, counters and fixtures | ||
| Cabinets | Boxes, fronts, hardware, installation. | |
| Countertops | Template, fabrication, sink cutout, install. | |
| Sinks and faucets | Include the rough-in parts your plumber needs. | |
| Appliances | Range, fridge, dishwasher, hood, microwave. | |
| Lighting and hardware | Fixtures, dimmers, pulls, bath accessories. | |
| Living through it | ||
| Temporary kitchen or bath | Microwave, hot plate, dish tub, shelving. | |
| Storage or pod | For furniture and the things you cannot live without. | |
| Eating out and laundry | The quiet line item. Track it for a month. | |
| Subtotal | — | |
| Contingency | — | |
| Total | — | |
Contingency is money you hope not to spend. Put it in the total anyway — the project will find a use for it. Read how to size a real contingency before you pick a percentage.
Quick estimate
Example split only — not a quote, not a market average.
- Design and approvals 7% —
- Construction and labor 36% —
- Cabinets, counters and fixtures 35% —
- Living through it 7% —
- Contingency 15% —
The split is a starting point for a first remodel, not a rule. Your scope, region and finishes will move it.
How to fill it in
Start with the total you can spend without touching emergency savings. Not the amount a lender will approve, and not the amount you hope to spend. The number that lets you sleep.
Then work down the page. Put a real number against every line you expect to pay for, and a zero against the ones that do not apply. A zero is information; a blank is a decision you have not made yet.
The contingency line is not optional. It is the part of the budget that pays for what the walls hide, what the schedule changes, and what you decide differently once you see the room without cabinets. Ten to fifteen percent is a common starting point for a first remodel; older homes and structural work deserve more.
About the example figures
The button above loads a set of example numbers so you can see how the worksheet behaves. Every one of those figures is an example, not a quote, a market rate or a recommendation. They are deliberately round and deliberately generic.
If you want a quick sense of how an all-in budget splits, use the sliders at the bottom of the worksheet. That split is also an example: a planning starting point, not a rule. Your region, scope and finishes will move it, sometimes by a lot.
Where budgets actually break
The invisible scope. Permits, dumpsters, delivery fees, temporary storage and the cost of eating out for six weeks are real line items. They are boring, which is why they get left out.
The allowance gap. A contractor’s allowance for tile is a placeholder, not a promise. If you choose tile that costs three times the allowance, the difference arrives later as a change order.
The contingency you spend twice. If you use the contingency for an upgrade, it is gone. Keep it labelled and keep it separate, and decide in writing who can release it.
What to do with the total
Compare it to the estimates you collect. If the bids come in above your number, the answer is usually scope, not negotiation: remove a line, phase the work, or wait. A contractor who cuts the price to match a budget you invented is a contractor who will find the difference later.
When the numbers are ready, take the worksheet to your timeline and your permit questions. And if you want the longer explanation of contingency, read how to build a remodel budget with a real contingency.
When you're ready
Want a second set of eyes on the numbers?
A good remodeling company will walk your worksheet with you before anyone signs anything. TFL Remodel is who we point readers toward when the plan is ready for a bid.
Opens tflremodel.com in a new tab. Remodel.lol is an independent planning guide and does not take a referral fee.